specialist control systems
meste SIMULATor
(Employment with Beca)
Royal New Zealand Navy MESTE (Marine Engineering Simulator Training Establishment), Devonport
Design, documentation and supervision of the electrical reticulation, lighting and small power, voice/data wiring and the specialist communications wiring for the new naval frigate simulator.
Air New ZeaLand, Hangar 2 Ground Power Unit Installation Project
(Employment with Beca)
Design, documentation, procurement of the Hangar 2 Class 1 Zone 1 floor pits, electrical infrastructure, including site supervision, commissioning and certification. Separate procurement package provided for the 400 Hertz mobile ground power units.
Auckland Airport, Pier A and Pier B, Ground Power Units Commissioning
(Employment with Beca)
Site supervision, commissioning and certification of the ground power units (GPU) on Pier A (10 units) and Pier B (4 units).
Auckland Airport, Feasibility Study of Boom Air Automated Hose Retraction System
(Employment with Beca)
Research and presentation of feasible options for automated air hose and electrical apron reticulation to the Airlines User Group. Feasibility study and technical advice on the optional use of the Boom Air hose retraction system and methodology for installing on existing air bridges.
Project Takanini, Royal New Zealand Air Force, Palmerston North Central GPU System Review
(Employment with Beca)
Review of a central GPU distributed system and associated report on advantage/disadvantages when compared to mobile GPU system.
Auckland City Council (Outdoor Art Project) Grafton Bridge Sound System
(Employment with Beca)
Design to preliminary design stage of a specialist outdoor public address/music system on the Grafton Bridge as part of an outdoor art initiative.
Ports of Auckland Robotic Container Cranes Feasibility Study, Auckland
(Employment with Beca)
Technical reporting to Beca Infrastructure on the design, feasibility, and broad brush pricing for the high voltage, low voltage, fibre optic and associated controls for the infrastructure to enable robotic cranes to be installed.
Auckland Harbour Bridge Refurbishment – Materials Handling Electric Train Tender
(Employment with Beca)
Technical reporting to Beca Infrastructure on the tender aspects of the material handling electrical train, required to operate inside the Auckland Harbour Bridge to carry steel sheets to the points of refurbishment.