Chorus/Papatoetoe Exchange Controller Manual

(Employment with Beca)

Chorus wished to replace their existing twin generator control panel with a Deep Sea 7320 controller option that would allow automatic prime/standby selection cycling every two weeks as part of their systematic upgrades. This project was then revised to include writing a DAP (Dual Auto-Panel) manual, schematic and physical layout drawings as part of their Gold, Silver and Platinum upgrade program.

CDMA roll-out project

(Under contract to Worley Consultants)

Team Leader and Electrical Engineer for a project team for the CDMA cell site housing upgrade for Lucent Technologies.

The project was done in conjunction with Opus International Consultants  due to the size, complexity and short project time frame.  Some 308 sites, throughout New Zealand were surveyed with redesign done tot he cell houses to accomodate the CDMA transmission/recieving equipment, battery supplies, and UPS modules.