Internal Engineering Duties

Electrical Lead for the electrical development, training and technical design guide production.  This included development and introduction of new software, structured training systems, specialist education and standardisation of design practices throughout the New Zealand offices. 

Author of a number of technical articles, design guides and training presentations.

training modules and presentations

Introduction to CYMAP 2013 Training Module
CYMAP Building Lighting and Power Training Module
CYMAP Wiring Training Module
Electrical for Mechanical Training Module
Introduction to Buildings Service (Electrical) Training Module
Basics for the Electrical Engineer Training Module
Electrical basics for the Non-Electrical Engineer Training Module
Ground Power Units (GPU) Technical Presentation
Visual Fire Alarms and Epileptic Fits Technical Presentation
Electrical Switchroom Safety Training Module for Building Services Engineers
Electrical Switchroom Safety Training Module for Non- Building Services Engineers
Electromagnetic Controls Training Module
Certified Electrical Design Certificates Training Module
Arc Flash Briefing Training Module
AS/NZS 3000 Wiring Rules Study Modules (26 Module Study Course)

QA Checklists

Electrical switchboard Inspections
Electrical Site Inspections
Verifications Procedures required from an Electrical Contractor
F06/03 Lighting Design Verification Checklist
F06/03 Electrical Design Verification Checklist
F06/03 Security Design Verification Checklist

DESIGN GUIDES

Cable Fault Attenuation Calculation Methods
Basics of HRC fuse protection
Typical (Electrical Equipment) MTBF values
Manipulation of IES file formats to import into Dialux
Switching of the neutral conductors on rising mains looped submains
Standardised Electrical Symbols
Standardised Security Symbols
Standardised Nurse Call Symbols
Standardised Communication Systems Symbols
Entry into HV Area and Mandatory PPE gear
Changes to the Electricity (Safety) Regulations and their effect on Building Services Verification Procedures
Building Services Explosive Atmosphere Design Procedure
Electrical Integrated Photovoltaics Paper
Lighting Controls Options Summary Paper (Editing and verification role)
Arc Flash Design Guide
HSNO Oil Storage in Buildings for Generators Paper (Editing and verification role)
CYMAP Design Clarifications
CYMAP Error Code Explanations
CYMAP Initial customisation (to New Zealand) procedure
CYMAP Treatment of MEN Earthing systems
CYMAP Switch and Load switch Explanation
CYMAP VSD Error Code Explanation
CYMAP Script Error Explanation
PV's integrated into Buildings (Editing and verification role)